AMRA – The World’s First Integrative Wellness Resort

Dubai
AED 690,000
Dubai
Property Type: Residence
Studio 1,2,3,4 BR
1
846 sqft / 79 m²
Handover Date: 2028

About

AMRA represents a new global benchmark in wellness-focused residential living. Designed as the world’s first fully integrative wellness resort, the project spans across three beachfront towers overlooking a 90 sq.km untouched lagoon, offering residents an environment where nature, luxury and longevity blend seamlessly. Built upon the 7 Pillars of Integrative Wellness, AMRA brings together cutting-edge wellness science, nature immersion and neo-luxury hospitality to create a lifestyle centered around balance, vitality and long-term well-being.

Here, wellness is not an amenity — it is a way of life. Residents enjoy access to hydrotherapy pools, cryotherapy suites, hyperbaric oxygen chambers, salt rooms, meditation and mindfulness spaces, rooftop beach clubs, padel courts, and panoramic fitness studios with breathtaking water views. Every element is curated to rejuvenate the body, calm the mind and uplift the spirit, allowing homeowners to experience resort living every day, not just on vacation.

With 820 fully furnished and serviced residences and over 470,000 sq.ft of wellness, leisure and entertainment zones, AMRA functions as a private retreat designed for both living and investing. Positioned within the UAE’s protected Blue Carbon Zone, the development ensures every unit benefits from calming water views, direct access to mangroves, clean air and a thriving natural ecosystem. It stands as a next-generation wellness destination where modern comfort meets restorative nature, making it a distinguished choice for those seeking regeneration, longevity and high-yield investment potential.

Key Features

Ownership Type: Freehold
Project Status: Off Plan
Sea View
Gross sq ft: Gross 846 sqft / 79 m²
Bedrooms: Studio 1,2,3,4 BR
Balcony: Private Balcony

Floor Plans

1 Bedroom
1 Bathroom
Apartment
500 sqft / 46 m²
Prices from 1.6M AED
2 Bedrooms
2 Bathrooms
Apartment
600 sqft / 56 m²
Prices from 2.6M AED
3 Bedrooms
3 Bathrooms
Apartment
700 sqft / 65 m²
Prices from 3.7M AED

Amenities

Kitchen
Balcony
24/7 Security
Swimming Pool
Gym
BBQ Area

Project Timeline

2025 – Infrastructure Works and Initial Construction Phase

  • Throughout 2025, the project site undergoes extensive infrastructure development, ground preparation and the initial foundation construction phase. This period represents the most critical stage, where engineering work that will add long-term value to the project is completed.

2026 – Structural Progress and Vertical Construction

  • In 2026, vertical construction begins and the majority of the residential blocks continue to rise. During the same year, the technical designs of the social facilities and wellness center are finalized. This is the stage where the project becomes physically visible and investor confidence reaches its peak.

2027 – Interior Works and Landscaping Phase

  • The year 2027 marks the acceleration of interior finishing, installations and mechanical system setups. Additionally, the landscaping and lagoon elements key components of the master plan begin to take shape. From this point on, the resort-style living experience starts to emerge.

2028 – Final Completion and Handover Process (Q4 2028)

  • The official completion and handover of AMRA Residences is scheduled for the fourth quarter of 2028 (Q4 2028). By this time, all residential blocks, social facilities and communal areas will be fully completed and ready for delivery. Investors and future residents will step into a premium coastal lifestyle.


Payment Plan

The developer has crafted a clear and investor focused payment structure, ensuring maximum flexibility throughout the entire development cycle. The staged installment plan enables buyers to manage their cash flow comfortably while securing their investment with ease.

10% Purchase Date (+4% DLD + AED 3,000 Oqood) | 10% After 2 Months | 10% After 7 Months | 10% After 12 Months | 10% on 30% Construction | 10% on 50% Construction | 10% on 70% Construction | 10% on 90% Construction | 20% on Completion

Location

UAQ Downtown
5 minutes
Beach Residences
5 minutes
Financial Centre
10 minutes
Vida Resorts
10 minutes
25 Hours Hotel
10 minutes
The Mangrove Beach
15 minutes
Dreamland Aqua Park
20 minutes
Umm Al Quwain Hospital
10 minutes
Sheikh Khalifa Hospital
20 minutes
Dubai International Airport
40 minutes
Ras Al Khaimah Int'l Airport
25 minutes
Sharjah Int'l Airport
35 minutes
Dubai Marina
55 minutes
Dubai Design District (D3)
45 minutes
Mall of the Emirates
50 minutes
Schools & Universities
10-15 minutes
Al Khor Mangrove
Direct access
Marjan Island
15 minutes
Back to top